Center of Transportation
- Home
- Investment Strengths
- Attractive Investment Climate
- Center of Transportation
International Airport
- Daegu International Airport (1 domestic route, 7 international routes from 5 countries)
- Daegu-Gyeongbuk New Integrated Airport (expected to open in 2030)
- Location: Sobo-myeon, Gunwi-gun and Bian-myeon, Uiseong-gun
- To be constructed as the crucial airport in charge of 25 percent of the domestic mobility of passengers and freight
- Airstrip 3.8㎞ / the construction of an advanced logistics airport for medium-and long-haul flights
- Military airport 16.9㎢ (2.3 times the current size), civilian airport 0.83㎢ (5 times the current size)
- Establishment of logistics terminals as an economic logistics airport
High-Speed Railway
- Dongdaegu Station (KTX‧SRT, 1hr 30min-drive to Seoul, 50 min-drive to Busan)
- Seodaegu Station (KTX‧SRT, the operation to be started on Mar. 31, 2022)
- Daegu Industrial Line Railway (Seodaegu Station~Daegu National Industrial Complex, the construction to be completed in 2027 / passengers and freight transport)
Expressway
- 9 expressways (Gyeongju, Busan, Gwangju, etc.) connecting as many as 8 IC
International Port
- 4 International Ports (Busan, Ulsan, Pohang, Masan) 1 hour-drive